![]() What hot water unit can I use to replace my existing hot water unit? Homeowners are now able to choose a hot water system that best suits their circumstances, including an electric system.Īs of the 1 February 2013 it is no longer a mandatory requirement to install energy efficient hot water systems such as gas, solar or heat pumps in new homes and existing houses located in a gas reticulated area. What hot water unit must I install on a new dwelling? multiple residential, commercial, unsewered properties and secondary dwellings not separately connected to water and sewer.ģ. Applies to all other building types (classes 1b and 2-9) and those applications excluded from the fast-track process, e.g.If additional information is required by the assessing officer an information request will be issued within 10 business days. Approval timeframe - 10 business days subject to the lodgement of all mandatory items.Available for the majority of new single residential dwellings, sheds or domestic outbuildings, (classes 1a and 10a only) within sewered areas.Approval timeframe - two (2) business days subject to the lodgement of all mandatory items.Plumbing Permit applications are broken into two assessment streams, Fast-Track and Standard. ![]() How long does the plumbing application approval process take? Should you wish to discharge pool backwash to the sewer please contact QUU on 13 26 57, or via their website 2. In accordance with the Southeast Queensland Water Supply and Sewerage Design and Construction Code (SEQ Code) pool backwash cannot be discharged to sewer in Ipswich without Queensland Urban Utilities (QUU) approval.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |